Property analysisgeoportalPRO

Land Parcel
Report

Cadastral parcel 145/12, cadastral district 0012 Borkowo, Żukowo municipality, Kartuzy county, Pomorskie voivodeship

145/12

Parcel identifier

220505_2.0012.145/12

Report date

02.03.2026

Scope

11 sections, 41 analyses

Prepared by

geoportalPRO team

Fig. 1Orthophoto. Location of the parcel, its boundaries and the access point onto the municipal road. Ź-09Ź-01

Basis and scope of the report

Nature of this document. This report compiles information obtained from external public registers and spatial datasets. It is not an official document, a certificate or a register extract. The full set of disclaimers is given in section 11.

Sources and responsibility. Every table, map and group of indicators carries a reference to the list of sources in the annex, which names the dataset, the body responsible for its content, the legal basis on which it is maintained, and the date and time the data was retrieved.

Notation. Ź-nn information reproduced from an external register. OW result of a calculation performed on register data. SZ indicative estimate, not an official figure.

Registered area
3,120 m² (0.3120 ha) Ź-01
Zoning designation (MPZP)
12MN. Single-family housing Ź-02
Access
Municipal road No. 168012G, asphalt Ź-07Ź-09
Registered land use types
RIVb 0.2380 ha · PsIV 0.0740 ha Ź-01
Utilities at the boundary
Electricity 8 m · water 14 m · fibre 35 m Ź-05Ź-06
Sanitary sewer
Nearest sewer 118 m Ź-05
Landform
Flat site, 83% below 2° Ź-12OW
Flood risk
None Ź-11
Centroid coordinates
54°20'15"N 18°21'40"E (WGS84) Ź-01OW

01

Parcel identification and geometry

1.1Cadastral data

Extract from the Land and Building Register (EGiB)Ź-01
Parcel numberOfficial areaLand use typeSoil classOwnership groupAs at
220505_2.0012.145/120.3120 haR, arable landIVbnatural persons14.02.2026
220505_2.0012.145/120.0740 haPs, permanent pastureIVnatural persons14.02.2026

What this means for the project. The land is registered as agricultural, soil classes IVb and IV. Classes IV and below do not require ministerial consent for exclusion from agricultural production, but exclusion is still required before construction starts and carries a fee. To be confirmed with the county office.

SourcesŹ-01

1.2Geometry and dimensions

Geometric parametersŹ-01OW
Registered area3,120 m² (0.3120 ha)
Area from geometry3,118 m² (0.06% difference)
Approximate dimensions52.4 m x 59.8 m
Perimeter224.4 m
Shapequadrilateral close to rectangular, compactness index 0.78
Road frontage52.4 m, eastern boundary
Number of boundary points4, all at cadastral accuracy class 1
Adjoining parcels145/11, 145/13, 146/2, 144/7

SourcesŹ-01OW

02

Planning and development potential

2.1MPZP. What may be built

The parcel is covered by a Local Spatial Development Plan (MPZP): Resolution No. XX/155/2023 of the Żukowo Town Council of 28.09.2023. The site carries the designation 12MN, with the whole parcel in a single land-use category.

Plan provisions for site 12MNŹ-02
Primary useDetached single-family housing
Permitted secondary usesNon-nuisance services up to 30% of the building floor area
Max. building height9.5 m, up to 2 storeys above ground
Max. building footprint25%, i.e. 780 m² on this parcel
Min. green (biologically active) area50%, i.e. 1,560 m²
Floor area ratio0.10 to 0.60
Roof geometrygable or multi-pitched, 30 to 45°
Building setback line6 m from the road reserve boundary
Min. area of a new parcel1,000 m², subdivision into 3 parcels feasible
Parking spacesmin. 2 per dwelling, within the parcel
Vehicular accessfrom road 12KDL, existing access point

Practical conclusion

With a footprint allowance of up to 780 m² and a building line 6 m from the road, the parcel accommodates a house with a footprint of 150 to 200 m² plus a garage and driveway, without breaching the plan ratios.

Fig. 2

MPZP extract. The parcel against the plan drawing, with the legend, building lines and the boundaries of site 12MN.

SourcesŹ-02

2.2Municipal general plan and study

Strategic planning documentsŹ-03
DocumentProvision for the siteSignificanceAs at
Municipal general planMixed-use zone with single-family housing (SJ), primary residential profileconsistent with the MPZP, no conflictin preparation
Study of Conditions and Directions of Spatial DevelopmentLow-density residential areasstrategic document, the MPZP prevails2019

Where the documents differ, the provisions of the local plan (MPZP) in force prevail. Once adopted, the municipal general plan will replace the study, which may change the position for land not covered by a local plan. This parcel is covered by a local plan.

SourcesŹ-03

2.3Building permits within 200 m

Notifications and decisions since 2018Ź-04
No.Legal statusScopeDistanceAs at
1permit grantedsingle-family house42 m2024
2permit grantedconstruction of a 0.4 kV LV power network with cable connection boxesat the site boundary2023
3notification, no objectiondomestic sewage treatment plant88 m2023
4under considerationsingle-family house with garage126 m2025

Practical conclusion

Item 2 confirms that the LV network is being extended right at the parcel boundary. Item 3 shows that the municipality allows domestic treatment plants in this area, which matters given that the sewer is 118 m away.

SourcesŹ-04

2.4Analysis of neighbouring development

Buildings within 200 mŹ-01Ź-09OW
Number of buildings34
Single-family houses26
Outbuildings and garages8
Multi-family, commercial and industrial buildings0
Average building footprint132 m²
Average year of construction2009
Predominant number of storeys2
Nearest building to the boundary18 m

This analysis characterises the surroundings and shows how well a planned building would fit the neighbourhood. The counts and shares are derived from building geometry and parcel boundaries.

Fig. 3

Buildings and permits within 200 m. Existing buildings, decisions and notifications, located relative to the parcel.

SourcesŹ-01Ź-09OW

03

Access and infrastructure

3.1Access to a public road

AccessŹ-07Ź-09Ź-01
Road categorymunicipal road No. 168012G
Surfacebituminous, carriageway width 5.0 m
Adjacency to the parceldirect, eastern boundary, 52.4 m
Access pointexisting, surfaced
Right of waynot required
Distance to a voivodeship road2,150 m, DW 224
Distance to an expressway junction8,400 m, S6 Chwaszczyno junction

SourcesŹ-01Ź-07Ź-09

3.2Roads and railways planned or under construction

Linear infrastructure projects within 2 kmŹ-07Ź-08
ProjectStatusDistanceSource · as at
Upgrade of municipal road 168012G, footway and lightingin preparationat the boundaryŹ-07 2025
Railway line No. 201, section upgradeunder construction1,640 mŹ-08 2025

What this means for the project. The road upgrade at the boundary may cause temporary access disruption and will ultimately bring a footway and lighting. The railway upgrade 1,640 m away imposes no development restrictions, but may affect night-time noise levels.

SourcesŹ-07Ź-08

3.3Utility infrastructure

Utility networksŹ-05Ź-06
NetworkNearest lineLocationPractical conclusionSource · as at
Electricity, LV 0.4 kV8 mroad reserve, eastern boundarystandard connectionŹ-05Ź-06 01.2026
Water main DN 110 PE14 mroad reservesimple connectionŹ-05Ź-06 01.2026
Sanitary sewer DN 200118 mul. Sportowa, to the southcostly connection, consider a treatment plantŹ-05Ź-06 01.2026
Storm drainagenonenot present in the arearetention within the parcelŹ-05 01.2026
Medium-pressure gas640 mul. Gdańskaconnection uneconomic, heat pump as an alternativeŹ-06 01.2026
Fibre35 mroad reserve, connected addresses nearbyconnection feasibleŹ-06 12.2025

Practical conclusion

Electricity, water and fibre are available at the boundary. Two items call for a design decision: how wastewater is discharged and what heat source is used. Both affect the budget and the connection capacity required.

SourcesŹ-05Ź-06

3.4Overhead power lines and substations

Power lines and installations within 500 mŹ-05Ź-06OW
No.Line typeInstallationDistanceRestriction zone
1low-voltage lineoverhead line8 mno zone, installation clearances apply
2low-voltage linepole26 mno zone
3medium-voltage line, 15 kVoverhead line143 mtechnical corridor outside the parcel
4MV/LV transformer substationpole-mounted substation152 mno zone
5high-voltage line, 110 kVnone within 500 m2,780 mnot applicable

Nearest main substation (GPZ): 4,120 mDirection: south-eastAs at: 01.2026

Fig. 4

Utility map. Electricity, water, sewer and gas layers with distances from the boundary.

Fig. 5

Access map. Road category, access point and the surrounding road network.

SourcesŹ-05Ź-06OW

04

Risks and nuisances

4.1Water. Flooding and standing water

Water-related hazardsŹ-11Ź-12OW
PhenomenonAnalysis resultArea on the parcelSource · as at
Q1% special flood hazard areanot present0 m²Ź-11 2024
Q10% flood hazard areanot present0 m²Ź-11 2024
Preliminary flood risk assessmentno identified risk in this areanot applicableŹ-11 2023
Areas prone to standing waterclosed depression, northern part280 m² (9%)Ź-12OW 2024
Distance to a surface watercoursedrainage ditch, to the west96 mŹ-12 2024

Recommendation

Inspect the site after heavy rainfall and commission geotechnical investigation before designing the foundations. With no storm drainage available, plan retention and infiltration within the parcel, avoiding the area prone to standing water.

Fig. 6

Water-related risk map. Flood zones, closed depressions derived from the terrain model, and the course of the ditch.

SourcesŹ-11Ź-12OW

4.2Ground subsidence and mass movement

Vertical ground displacement, measurement points within 500 mŹ-13Ź-14
No.Mean subsidence [mm/year]Tolerance [mm]Elevation m a.s.l.Distance
1-0,81,111812 m
2-0,60,911988 m
3-0,41,0118214 m

Landslides and areas at risk of mass movement: noneSource: SOPOAs at: 2025

Negative values indicate subsidence, positive values uplift. The measured rate falls within the tolerance of the measurement, so there is no evidence of vertical movement relevant to building foundations.

SourcesŹ-13Ź-14

4.3Noise and air quality

52 dB

Noise, daytime

44 dB

Noise, night-time

11 µg/m³

PM 2.5, annual mean

19 µg/m³

PM 10, annual mean

Comparison with standards and limit valuesŹ-15Ź-16
IndicatorAnalysis resultStandard or limit valueSource · as at
Road noise, daytime52 dB65 dB for single-family housingŹ-15 2024
Road noise, night-time44 dB56 dB for single-family housingŹ-15 2024
Particulate matter PM 2.511 µg/m³, within the standard20 µg/m³, annual meanŹ-16 2024
Particulate matter PM 1019 µg/m³, within the standard40 µg/m³, annual meanŹ-16 2024

SourcesŹ-15Ź-16

4.4Nuisance installations and materials

Potential nuisance sources within 500 mŹ-09Ź-16OW
CategoryAnalysis resultDistanceSource · as at
Industrial plants and IPPC installationsnonenot applicableŹ-16 2025
Landfills and waste collection pointsnonenot applicableŹ-16 2025
Farm or livestock buildingnonenot applicableŹ-09 2025
Asbestos-containing materials2 items in the municipal inventory, outside the parcel180 m, 340 mŹ-16 2024
Mobile phone mast1 installation470 mŹ-09 2025

SourcesŹ-09Ź-16OW

05

Nature conservation and heritage

5.1Nature conservation designations and forest

Conservation designations and forest landŹ-17Ź-18
CategoryOn the parcelNearest featureSourceDistance
National park, nature reservenot presentnone within 5 kmŹ-17not applicable
Natura 2000 sitenot presentDolina Raduni PLH220007Ź-173,850 m
Protected landscape areanot presentOtomiński protected landscape areaŹ-171,240 m
Natural monumentnot presentpedunculate oak, reg. no. 118Ź-17480 m
Forest land (Ls)not presentprivate forest, compartment 142bŹ-18210 m

Proximity to forest. At 210 m, the distance to forest land exceeds the fire separation required for a single-family house, which is 12 or 16 m depending on the fire resistance class. In this case, proximity to forest imposes no additional design requirements.

SourcesŹ-17Ź-18

5.2Heritage, archaeology and protection zones

Heritage protection and restriction zonesŹ-19
CategoryOn the parcelNearest asset or zoneDistance
Register of historic monumentsno entryparish church, reg. no. A-1284620 m
Heritage conservation zonenot presentzone B in the village centre540 m
Archaeological sitenot presentsettlement, AZP 12-42/7340 m
Cemetery protection zone (50 m and 150 m)not presentparish cemetery780 m
Closed areas (tereny zamknięte)not presentnone within 5 kmnot applicable
Wind turbine setback zonenot presentnone within 5 kmnot applicable
Spa protection zonenot presentdoes not apply in this municipalitynot applicable
Public purpose investment zonesnot presentno claims or land reservationsnot applicable

Practical conclusion

No heritage approvals or archaeological supervision were identified as required for building a single-family house. No protection zone covers the parcel.

Fig. 7

Nature conservation, heritage and protection zones. Conservation designations, historic assets, archaeological sites and zones around the parcel.

SourcesŹ-19

06

Physiography, soils and geology

6.1Landform and slope analysis

Distribution of slope across the parcelŹ-12OW
Slope classAreaShareAs at
Flat, below 2°2,590 m²83%2024
2° to 5°468 m²15%2024
5° to 10°62 m²2%2024
Above 10°0 m²0%2024

118,0

Min. elevation [m a.s.l.]

119,4

Max. elevation [m a.s.l.]

1.4 m

Elevation range

SW, 62%

Predominant aspect

Earthworks balance, indicative. For a design level of 118.6 m a.s.l., the estimated cut is 240 m³ and the fill 310 m³, leaving a soil deficit of 70 m³. These figures support an initial estimate of earthworks cost and require confirmation once the site layout design is prepared.

Fig. 8

Slope and elevation map. Slope classes, spot elevations and the direction of fall.

SourcesŹ-12OW

6.2Land cover, solar exposure and climate

Land cover and climatic conditionsŹ-09Ź-24Ź-25
ParameterValueRelevance to the projectSource · as at
Land coverarable land and pasture, no tree coverno clearance cost or approvalsŹ-09 2025
Annual solar irradiation1,020 kWh/m²favourable for a rooftop PV installationŹ-25 2024
Mean annual air temperature8.4 °Cinsulation and heating capacity selectionŹ-24 2025
Annual precipitation620 mmsizing of retention and drainageŹ-24 2025
Frost depth zone1.0 mminimum foundation depthstandard
Snow load zone2roof structure designstandard
Wind load zone2structural and roof covering designstandard
Prevailing wind directionwest and south-westbuilding orientation and screeningŹ-24 2025

SourcesŹ-09Ź-24Ź-25

6.3Soils

Soil fertility and classificationŹ-23Ź-01
ParameterValueShare of areaSource · as at
Soil fertility groupmoderately fertile soils, category 4100%Ź-23OW 01.03.2026
Soil and agricultural complexvery good rye complex (4)76%Ź-23 2024
Soil typeleached brown soils100%Ź-23 2024
Soil valuation classIVb and IV76% and 24%Ź-01 14.02.2026

SourcesŹ-01Ź-23OW

6.4Geology and ground conditions

Geological structure and building conditionsŹ-20Ź-21Ź-22
ParameterValueSource and shareSource · as at
Surface depositsglaciofluvial sands and gravels, PleistoceneSMGP 1:50,000, sheet 25Ź-20 2018
Geological building conditionsaverage94% of the parcel areaŹ-20 2017
Building conditions at 2 m below ground levelaverage, locally good94% and 6% of the areaŹ-20 2017
Depth to the first groundwater table2.8 m b.g.l.interpolated from boreholesŹ-21 2023
First aquifer2 to 5 m b.g.l.Hydrogeological Map of PolandŹ-21 2021
Potential yield of a drilled well10 to 30 m³/hMhP, sheet M-34-7-AŹ-21 2021
Mineral deposits and mining areasnone on the parcelMIDAS, nearest deposit 2,400 mŹ-22 2025

Recommendation

Two to three boreholes and a geotechnical opinion before the building design is prepared. With the water table at 2.8 m below ground level a basement is worth considering, but this needs confirmation through investigation and an assessment of seasonal variation.

Fig. 9

Geology and building conditions. Surface deposits, building conditions at 2 m below ground level and the depth to the first groundwater table.

SourcesŹ-20Ź-21Ź-22

07

Surroundings, services and travel times

7.1Services and public amenities

Nearest everyday amenitiesŹ-09Ź-29OW
CategoryInstallationSourceDistanceWalking time
Public transportbus stopŹ-09260 m4 min
Courier servicesparcel lockerŹ-29380 m5 min
Everyday shoppinggrocery shopŹ-29420 m6 min
Educationprimary schoolŹ-091,900 m6 min by car
EducationnurseryŹ-091,350 m4 min by car
HealthcareGP clinicŹ-092,400 m7 min by car
Large-format retailsupermarketŹ-293,100 m8 min by car
Recreationsports pitch and playgroundŹ-09640 m9 min

SourcesŹ-09Ź-29OW

7.2Walking and driving isochrones

10 min

On foot

Bus stop, shop, parcel locker, playground.

20 min

By car

Żukowo and Kartuzy. Schools, clinics, supermarkets, public offices.

60 min

By car

Gdańsk, Gdynia and Sopot. The Tricity job market, airport 24 km.

Population density within 1 km: 118 people/km²Address points within 500 m: 96As at: 2025

Assumptions: typical off-peak traffic, routes along public roads, walking speed 4.5 km/h.

Fig. 10

Isochrones and amenities. The 10-minute walking range and 20- and 60-minute driving ranges, with amenity categories.

SourcesŹ-09Ź-10Ź-28OW

08

Market context and taxes

8.1Transaction prices for undeveloped land

PLN 236

Median per m²

PLN 241

Mean per m²

PLN 168

Minimum per m²

PLN 312

Maximum per m²

Transactions within 500 mŹ-26
No.YearAreaPrice per m²Transaction priceDistance
120251,040 m²PLN 312PLN 324,000140 m
220251,480 m²PLN 268PLN 396,000220 m
320243,020 m²PLN 236PLN 712,000310 m
420242,260 m²PLN 229PLN 518,000360 m
520241,120 m²PLN 214PLN 240,000420 m
620234,180 m²PLN 186PLN 778,000470 m
720235,640 m²PLN 168PLN 948,000490 m

Reference to the parcel analysed. At a median of PLN 236/m², the indicative market value of a 3,120 m² parcel is around PLN 736,000. Factors pulling below the median: no sewer at the boundary, no gas network and the area prone to standing water. Factors pulling above it: direct asphalt access, a local plan in force and a south-west aspect. This comparison with transaction prices is indicative only SZ. It is not a determination of property value within the meaning of the Polish Real Estate Management Act and does not constitute a formal property valuation report.

SourcesŹ-26OWSZ

8.2Other market indicators

Asking and transaction prices in the areaŹ-26Ź-27
IndicatorValueAnalysis extentSource · as at
Mean asking price, building plotsPLN 268/m²5 km radiusŹ-27 02.2026
Mean transaction price, developed plotsPLN 385/m² of land2 km radiusŹ-26 2025
Mean transaction price, flatsPLN 9,850/m² of usable floor areaŻukowo municipalityŹ-26 2025
Land price trend+7.4% year on year5 km radiusŹ-26 2025

SourcesŹ-26Ź-27

8.3Taxes and charges

Public charges, as they stand now and after development. The third column contains estimates SZŹ-30Ź-01
ItemRateEstimate for this parcelSource · as at
Agricultural tax, current statusbased on conversion hectares, 0.2380 conversion haapprox. PLN 62/yearŹ-30Ź-01 2026
Property tax, other landPLN 0.71/m²/yearPLN 2,215/year once developedŹ-30 2026
Property tax, residential buildingsPLN 1.15/m² of usable floor area/yearPLN 207/year for 180 m² of usable floor areaŹ-30 2026
Fee for exclusion from agricultural productionclass IVb, depends on the area excludedto be established with the county officeŹ-01 2026
Betterment levyup to 50% of the increase in value, set by municipal resolutionpossible once the networks are builtŹ-30 2026

Property tax rates are set by municipal council resolution and change annually. The calculation needs confirming once the land use changes.

SourcesŹ-01Ź-30SZ

09

Recommended verification steps

  1. Confirm the MPZP provisions at the municipal office: the plan drawing, the legend and the text of Resolution No. XX/155/2023 for site 12MN.
  2. Apply for connection conditions: electricity, water, sanitary sewer and telecoms. For the sewer, ask for a quote for the 118 m connection and for the conditions applying to a domestic treatment plant.
  3. Commission geotechnical investigation, two to three boreholes to 4 m below ground level. This settles the cost of foundations and drainage and whether a basement is feasible.
  4. Check the land and mortgage register, sections I-O, II, III and IV. Verify easements, claims, mortgages and whether the area matches the cadastre.
  5. Establish with the county office the procedure and cost of excluding class IVb land from agricultural production.
  6. Visit the parcel after heavy rainfall to verify the area prone to standing water in the northern part.
  7. Ask the municipality about plans to upgrade road 168012G and about the betterment levy resolution in force.

Basis of this listOW

Disclaimer on conclusions

This list sets out the minimum scope of verification before a decision is taken. It is not exhaustive and does not replace documents, approvals or opinions issued by authorities, network operators and qualified specialists. The client bears the consequences of omitting these steps. Clauses 14 to 18.

10

Summary for the decision

The parcel is suitable for a single-family house. The local plan permits development, and access and basic utilities are at the boundary. Two issues raise the cost: the sanitary sewer is 118 m from the boundary, and 280 m² in the northern part of the site may hold standing water at times.

Disclaimer on conclusions

The conclusions, risk flags and matrix are an interpretation of the data compiled in this report, made as at the date it was prepared. They are not advice, an investment recommendation, an assurance or a guarantee that the property is fit for the client's intended purpose. They hold on the assumption that the source data is accurate and has not changed since the retrieval date given in the list of sources. The client takes the decision independently, having obtained the documents and opinions listed in section 09. Clauses 14 to 18.

10.1Key findings

Zoning designation

MPZP, site 12MN. Single-family housing, non-nuisance services up to 30% of the usable floor area. Building footprint up to 25%, height up to 9.5 m.

Access

Direct access onto municipal road No. 168012G, asphalt surface. Road frontage of 52 m. No easement needs to be established.

Utilities

LV electricity 8 m, water 14 m, fibre 35 m. Sanitary sewer 118 m. No gas network nearby, the closest main is 640 m away.

Terrain

Flat, 83% of the area below 2° of slope. South-west aspect over 62% of the area. Elevations 118.0 to 119.4 m a.s.l.

Ground conditions

Glaciofluvial sands and gravels. Building conditions at 2 m below ground level are average across 94% of the area. First groundwater table at 2.8 m b.g.l.

Risks

No flood zones, landslides or heritage restrictions. Standing water on 280 m² (9%). Daytime noise 52 dB. PM 2.5 within the standard.

Surroundings

Single-family housing, 34 buildings within 200 m. Bus stop 260 m, shop 420 m. No nuisance installations within 500 m.

Market

Median transaction price for undeveloped land within 500 m: PLN 236/m². Seven transactions between 2023 and 2025.

SourcesŹ-01Ź-02Ź-05Ź-11Ź-12OW

10.2Risk flags and what to check

Amber flags. To verify

  • Sewer 118 m from the boundary. Technical conditions and the cost of the connection need confirming. The alternative is a domestic treatment plant, which the plan permits.
  • Standing water on 280 m². The terrain model shows a closed depression in the northern part. A site visit after rainfall and geotechnical investigation are advisable.
  • No gas network. The nearest main is 640 m away. A heat pump is worth considering, which affects the connection capacity required.

Red flags. None

None found: Q1% and Q10% flood hazard zones, landslides or areas at risk of mass movement, entry in the register of historic monuments, heritage conservation zone, archaeological site on the parcel, closed areas, cemetery or wind turbine setback zones, high-voltage lines within 200 m, or exceedances of the PM 2.5 and PM 10 standards.

SourcesŹ-05Ź-11Ź-12Ź-14Ź-16Ź-19OW

10.3Risk matrix

Status of the constraint categories checked for parcel 145/12Ź-11Ź-12Ź-14Ź-17Ź-19Ź-05OW
CategoryStatus on the parcelSourceWeight for the decision
Flood risknot present, Q1% and Q10%Ź-11
Standing water280 m², 9% of the area, northern partŹ-12OW
Sanitary sewersewer 118 m from the boundaryŹ-05
Gas networknone nearby, 640 mŹ-06
Ground conditionsaverage, to be confirmed by investigationŹ-20
Ground subsidence-0.8 mm/year, within toleranceŹ-13
Landslides and mass movementnone documentedŹ-14
Nature conservationparcel outside protected areasŹ-17
Heritage and archaeologyno entry, no zonesŹ-19
Protection zones and closed areasnoneŹ-19
High-voltage linesnone within 200 mŹ-05
Noise and air quality52 dB daytime, PM 2.5 and PM 10 within the standardŹ-15Ź-16
Nuisance installationsnone within 500 mŹ-09

The weight for the decision reflects how much a category affects the cost and course of the project on this parcel, not the general importance of the issue. Details in sections 04 and 06, risk map at item 4.1.

SourcesŹ-05Ź-06Ź-09Ź-11Ź-12Ź-13Ź-14Ź-15Ź-16Ź-17Ź-19Ź-20OW

11

Legal disclaimers

The following provisions define the nature of this report, the scope of the service and the division of responsibility between geoportalPRO, the bodies maintaining the public registers and the client.

  1. 01Legal nature of the report. This document is a compilation of information obtained from public registers and spatial datasets, prepared on commission. It is not an official document, a certificate, an extract or a map excerpt from a public register, and it does not replace any of those documents.
  2. 02What the report is not. The report is not a formal property valuation report or any other determination of property value, a geotechnical opinion, a technical or construction survey, a legal opinion, legal advice or an investment recommendation. It does not replace the approvals, decisions and conditions issued by authorities and network operators.
  3. 03Scope of the undertaking. The service consists of the diligent retrieval, standardisation and compilation of data from the sources indicated. It carries no undertaking to achieve a particular outcome and no guarantee that the actual state of the property matches what the registers contain.
  4. 04Responsibility for the content of the data. Responsibility for the content, completeness and currency of information taken from the registers rests with the bodies maintaining them, as named in the list of sources. geoportalPRO is not the source of that information, does not verify it against the actual state of affairs and is not liable for the consequences of errors originating at the source.
  5. 05Time of data retrieval. The information reflects the state of the datasets at the date and time given in the list of sources. It may have changed since, in particular through a register update, the adoption or amendment of a planning act, or the issue of an administrative decision.
  6. 06Discrepancies between sources. Data from independent registers may differ because of different update dates, geometric accuracy and collection methods. Discrepancies found are flagged in the report but are not resolved by us.
  7. 07Binding information. Binding information on the legal and factual status of a property is issued solely by the competent authority, in the form prescribed by law. Before any disposal or investment decision, such documents should be obtained to the extent set out in section 09.
  8. 08Estimates and indicative values. Figures marked as estimates are indicative and carry uncertainty arising from the method used and the sample size. They cannot serve on their own as the basis for a financial, lending or tax decision.
  9. 09Identification of the subject of analysis. The analysis relates solely to the property identified from the data supplied by the client. The client is responsible for the accuracy of that data, in particular the parcel number and cadastral district.
  10. 10No site visit or investigation. The report was prepared solely from source data, without inspecting the property, taking field survey measurements or investigating the subsoil. Findings on ground and water conditions are indicative.
  11. 11Rights to the source data. The data was used on the licence terms applying to each dataset, as given in the list of sources. This report confers no right to redistribute the source data or to use it beyond those terms.
  12. 12Rights to the report. The client may use the report for their own purposes, including presenting it to their advisers and financing institutions. Public distribution, resale and commercial use other than the client's own require separate consent.
  13. 13Personal data. Transaction information is presented in aggregate form and does not allow the parties to be identified. The report contains no data on property owners and no other personal data.
  14. 14Nature of the conclusions and recommendations. The practical conclusions, risk flags and recommended verification steps are an interpretation of the data compiled in the report, made as at the date it was prepared. They are not advice, an investment recommendation, an assurance or a guarantee. They contain no assessment of the economic case for the project.
  15. 15Conditionality of the conclusions. Every conclusion holds only on the assumption that the source data it rests on is accurate and has not changed since the date and time of retrieval given in the list of sources. A change in even one premise may change the conclusion.
  16. 16No assurance of fitness for the client's purpose. The report contains no assurance that the property is fit for the client's intended purpose. Establishing fitness requires the official documents, approvals and specialist opinions listed in section 09.
  17. 17Independence of the client's decision. The client decides on acquiring the property and on the scope and manner of the project independently and at their own risk, having obtained the documents and opinions referred to in section 09.
  18. 18No effect towards third parties. The report was prepared for the client. It is not a statement towards third parties, in particular a seller, a buyer, a financing institution, an insurer or an authority. Third parties may not rely on its content.
  19. 19Consumer rights. The disclaimers above define the scope of the service and do not limit the rights available to a consumer under mandatory provisions of law. In the event of conflict, those provisions apply. The procedure for raising objections to the report is set out in the terms of service (PDF, Polish).

A

Annex. Data sources

This list covers every dataset used in the report. The references in the tables and figure captions point to the corresponding row.

Ź-nnInformation reproduced from an external register. Responsibility for its content, completeness and currency rests with the body named in the third column, under the provisions given in the fourth. geoportalPRO is not the source of this information and does not verify it.

OWResult of a calculation performed on register data, for example a distance or area measurement or a slope classification. geoportalPRO is responsible solely for the correctness of the method applied and of the calculation on the input data.

SZIndicative estimate. Unofficial information, carrying uncertainty arising from the method. It cannot serve on its own as the basis for a financial decision.

ItemDate and time of data retrieval. This records the moment the data was read from the source. The dataset may have changed since, in particular through a register update or the issue of a new act.

List of data sources used in the report
Ref.Dataset or type of informationBody responsible for the contentLegal basis for maintaining the datasetRetrieval methodData as at / retrieved
Ź-01Land and Building Register (EGiB)Starosta Kartuski (Kartuzy county authority)Geodetic and Cartographic Law, EGiB regulationregister extract and map excerpt, county WMS service14.02.2026retrieved 14.02.2026, 09:12
Ź-02Local Spatial Development Plan (MPZP), Resolution No. XX/155/2023 of the Żukowo Town CouncilRada Miejska w Żukowie (Żukowo Town Council)Spatial Planning and Development Actresolution text and plan drawing, APP service28.09.2023retrieved 12.02.2026, 11:40
Ź-03Municipal general plan and the study of conditions and directions of spatial developmentGmina Żukowo (Żukowo Municipality)Spatial Planning and Development Actresolution, document in preparation2019, general plan in preparationretrieved 12.02.2026, 11:52
Ź-04Register of building applications, decisions and notificationsGłówny Urząd Nadzoru Budowlanego (national building control office)Building Lawpublic register, e-services portal02.2026retrieved 18.02.2026, 08:31
Ź-05Geodetic register of utility networks (GESUT)Starosta Kartuski (Kartuzy county authority)Geodetic and Cartographic Lawcounty WMS service01.2026retrieved 14.02.2026, 09:28
Ź-06Network routing and connection condition data published by utility companiesElectricity, water and sewerage, gas and telecoms network operatorsEnergy Law, Collective Water Supply Actmaps and schedules published by the operators01.2026retrieved 20.02.2026, 14:05
Ź-07Public road register and the road authority investment plansMayor of Żukowo as the municipal road authority, Zarząd Dróg Wojewódzkich w Gdańsku (Pomorskie voivodeship road authority)Public Roads Actroad register, schedule of investment projects2025retrieved 19.02.2026, 10:17
Ź-08Railway line investment programmePKP Polskie Linie Kolejowe S.A.Rail Transport Actschedule of investment projects2025retrieved 19.02.2026, 10:26
Ź-09Topographic Objects Database (BDOT10k), detail suitable for mapping at 1:10,000Główny Geodeta Kraju (Surveyor General of Poland)Geodetic and Cartographic LawWFS service, GML dataset download2025retrieved 13.02.2026, 16:02
Ź-10Register of localities, streets and addresses (EMUiA)Gmina Żukowo (Żukowo Municipality)Geodetic and Cartographic Lawnational WFS service, address points2025retrieved 13.02.2026, 16:09
Ź-11Flood hazard maps and flood risk mapsPaństwowe Gospodarstwo Wodne Wody Polskie (national water authority)Water LawWMS service, Hydroportal2024retrieved 16.02.2026, 12:44
Ź-12Digital terrain model from airborne laser scanning, 1 m gridGłówny Geodeta Kraju (Surveyor General of Poland)Geodetic and Cartographic LawARC-ASCII download, WCS service2024retrieved 16.02.2026, 13:10
Ź-13European Ground Motion Service, InSAR monitoring of vertical ground displacementCopernicus programme, European Environment Agencyregulation establishing the Copernicus programmepoint layer download2025retrieved 21.02.2026, 09:55
Ź-14SOPO landslide protection system, register of landslides and areas at risk of mass movementPaństwowy Instytut Geologiczny (Polish Geological Institute)Geological and Mining LawWMS service, registration records2025retrieved 21.02.2026, 10:04
Ź-15Strategic noise maps and traffic noise measurementsRoad authorities, Gmina Żukowo (Żukowo Municipality)Environmental Protection Lawmap studies, measurement results2024retrieved 23.02.2026, 15:20
Ź-16State environmental monitoring, air qualityGłówny Inspektorat Ochrony Środowiska (Chief Inspectorate of Environmental Protection)Environmental Protection Inspection Actmeasurement data bank, air quality portal2025retrieved 23.02.2026, 15:33
Ź-17Central Register of Nature Conservation DesignationsGeneralna Dyrekcja Ochrony Środowiska (General Directorate for Environmental Protection)Nature Conservation ActWMS service, public register2025retrieved 24.02.2026, 08:47
Ź-18Forest Data Bank (BDL)Lasy Państwowe (State Forests)Forests ActWMS service, BDL portal2025retrieved 24.02.2026, 08:58
Ź-19Register of historic monuments, municipal heritage register and the AZP archaeological site recordPomorski Wojewódzki Konserwator Zabytków (Pomorskie heritage conservator), Narodowy Instytut Dziedzictwa (National Heritage Board)Protection and Care of Historic Monuments Actpublic register, heritage geoportal2025retrieved 24.02.2026, 09:15
Ź-20Detailed Geological Map of Poland, 1:50,000Państwowy Instytut Geologiczny (Polish Geological Institute)Geological and Mining LawWMS service, map sheet2017retrieved 25.02.2026, 11:02
Ź-21Hydrogeological Map of Poland, first aquiferPaństwowy Instytut Geologiczny (Polish Geological Institute)Geological and Mining LawWMS service2023retrieved 25.02.2026, 11:14
Ź-22Central Geological Database, boreholesPaństwowy Instytut Geologiczny (Polish Geological Institute)Geological and Mining Lawdatabase, borehole logs2023retrieved 25.02.2026, 11:29
Ź-23Soil and agricultural map and soil valuation classificationWojewódzki Ośrodek Dokumentacji Geodezyjnej i Kartograficznej w Gdańsku (voivodeship survey documentation centre)regulation on the soil classification of landvoivodeship WMS service2024retrieved 26.02.2026, 10:38
Ź-24Meteorological data from measurement and observation stationsInstytut Meteorologii i Gospodarki Wodnej (Institute of Meteorology and Water Management)Water Lawmeasurement database2025retrieved 26.02.2026, 12:07
Ź-25PVGIS solar radiation modelJoint Research Centre of the European Commissiondata published on open termscalculation service, data download2025retrieved 26.02.2026, 12:19
Ź-26Property price register (RCN)Starosta Kartuski (Kartuzy county authority)Geodetic and Cartographic Lawregister extract01.2026retrieved 27.02.2026, 09:41
Ź-27Asking prices published on listing portalsOperators of listing portalsdata published by private entities, outside public registerscompilation of listings02.2026retrieved 27.02.2026, 10:03
Ź-28Statistical data, including population density on a 1 km gridGłówny Urząd Statystyczny (Statistics Poland)Public Statistics ActLocal Data Bank, geostatistics portal2025retrieved 27.02.2026, 10:22
Ź-29Open data on the road network and amenitiesOpenStreetMap community, ODbL 1.0 licenceOpen Database Licencedataset download02.2026retrieved 27.02.2026, 10:35
Ź-30Resolutions on property tax rates and local chargesRada Miejska w Żukowie (Żukowo Town Council)Local Taxes and Charges Actresolutions, Official Journal of the Pomorskie Voivodeship2026retrieved 28.02.2026, 13:18
OWSpatial analysis performed on the source data listed here: distance and area measurements, slope classification, isochrone generation and statistical summariesgeoportalPRO, solely as regards the correctness of the calculations on the input datanot applicablecalculation on source data02.03.2026retrieved 02.03.2026, 08:00
SZIndicative estimate produced by the comparative method on register data. It is not a determination of property value within the meaning of the Polish Real Estate Management Act and does not constitute a formal property valuation reportgeoportalPRO, solely as regards the correctness of the method appliednot applicable, unofficial informationcalculation on register data02.03.2026retrieved 02.03.2026, 08:00

Scope of responsibility. geoportalPRO retrieves, standardises and compiles data from the registers listed. It does not verify that data against conditions on the ground or against official documents. Discrepancies between registers are possible and arise from different update dates and different source accuracy. Binding information is issued solely by the competent authority.

  • A1Boundary point coordinates in the PL-2000 system, with cadastral accuracy classes.
  • A2Full list of transactions from the property price register within 1 km, optional.
  • A3Detailed climate tables: monthly temperature and precipitation distribution, wind rose.
  • A4Confidence level and source resolution for each data layer.

This report does not replace official documents, geotechnical investigation, a formal property valuation report, legal analysis or the specialist opinions a given project may require. Figures marked as indicative or estimated require confirmation from the competent authority or by field investigation.

Order a report for your parcel

Send us a parcel number with its cadastral district, an address or a description of the location. The scope matches this document.

Land Parcel Report

PLN 99

Fixed price, one document.

Order a Land Parcel ReportSee what we analyseHome